D8.2 “Guidelines for design, implementation and verification of a testing facility for RAS assisted ship inspections”

[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 162
  • File Size 1 MB
  • File Count 1
  • Create Date June 30, 2021
  • Last Updated September 20, 2021

D8.2 "Guidelines for design, implementation and verification of a testing facility for RAS assisted ship inspections"

ROBINS Guidelines for design, implementation and verification of a testing facility for RAS assisted ship inspections